BLUEWATER BUILDING COMPANY · PROJECT SPOTLIGHT
A familiar shower layout can still be the starting point for a very different bathroom. For this primary bathroom upgrade, Bluewater Building Company replaced the finishes and fixtures, refreshed the vanity area, and added useful details around the toilet. The shower stayed in its existing layout with small modifications.
Finished tiled shower with glass above a half wall beside the bathroom doorway.
The work began with removal of the existing vanities, mirrors, lighting and toilet. The bathroom floor tile and the walk-in shower wall and floor tile were removed, too. Drywall was opened where needed, with new drywall installed in the affected areas.
The finished scope included a newly tiled shower with a glass front and glass above the half wall, new bathroom floor tile, a new vanity, mirror and lighting, and a new toilet. An outlet for a bidet and a cabinet in the toilet area added practical details. The room was repainted and all trim was replaced.
For homeowners planning a bathroom remodel in Hampton Roads, the useful takeaway is simple: decide what works about the room before deciding what to replace. This project paired a largely retained shower layout with a coordinated update to the surfaces, storage and lighting.
Walk-in shower with gray wall tile, a recessed niche, corner seat and glass door.
The existing shower layout was retained with small modifications. New tile and glass changed its appearance while keeping the shower in its familiar position.
In the finished photos, gray wall tile, a recessed niche and a corner seat sit behind the glass enclosure. The glass above the half wall keeps the tile visible from the rest of the bathroom. The wall tile, smaller shower-floor tile and warm metal fixtures give the shower its own distinct finish.
Dark wood-tone vanity and tall cabinets around an illuminated rectangular mirror.
The new vanity, mirror and lighting create a coordinated focal point. Dark wood-tone cabinetry frames the illuminated rectangular mirror, with storage both below the counter and in the taller cabinets at either side.
When planning your own remodel, look at those pieces together. Cabinet placement, the mirror and lighting all share the same small working area. A useful planning question is what needs to be close at hand during your morning routine.
New toilet beneath a wall cabinet, with an electrical outlet beside the toilet.
The toilet area received a new toilet, an outlet for a bidet and a cabinet above. Those updates give this part of the room a defined storage location and include the electrical provision in the remodeling scope.
Across the bathroom, new wood-look tile flooring, fresh paint and replacement trim tie the finished areas together. Lighting was installed or moved as needed, and the drywall work addressed the areas affected by the remodel.
Start with three lists: what works, what needs to change and what would make the daily routine easier. In this bathroom, the shower layout largely stayed while tile, glass, cabinetry, fixtures, lighting and finishes changed around it.
Your own scope may be different. Bringing photos of the current room and a short list of priorities helps make a remodeling conversation more specific. It also keeps the discussion focused on how you want to use the space.
Wood-look bathroom tile flooring and white trim around the shower half wall.
Front view of the glass shower door, tiled walls and mosaic shower floor.
Angled view of the shower glass, warm metal fixtures and gray tile.
The supplied scope retained the current shower layout with small modifications. An expanded shower was not part of the stated scope.
Drywall was removed as needed and replaced in the areas affected by the work. The project was not described as a full-room drywall removal.
Planning a primary bathroom remodel in Hampton Roads? Tell Bluewater Building Company what you would like to change and request a free estimate.
Explore Bluewater’s home renovation services or contact the team with questions about your project.